Stage 1 - Comprehensive Development Control Plan (DCP) Review

We are seeking your feedback on the Stage 1 drafts of the Comprehensive Review of the Bega Valley Development Control Plan 2013 (Comprehensive DCP Review).


All development applications in the Bega Valley Shire are required to consider Bega Valley Development Control Plan 2013 (DCP 2013) as a matter for consideration under Section 4.15(1)(a)(iii) of the Environmental Planning and Assessment Act 1979.

Council has commenced a thorough review of DCP 2013, and Stage 1 is now available for public review and feedback.

Stage 1 seeks to amend or replace the existing sections of the DCP listed in column 1 with the draft DCP listed in column 2:

Exising sections New section/s or amending section/s Extent of proposed changes
4.3 Setbacks
  • 4.3 Setbacks
Minor amendment to retain existing effect (removal of reference to Section 5.7)
5.7 On-site Sewerage Management
  • 5.7 On-site Wastewater Management
Complete replacement of section
5.8.3 Contaminated land
  • 5.8.3 Contaminated land
Complete replacement of section
5.8.4 Bushfire prone land
  • 5.8.4 Bush fire prone land
Amendments to existing section. New subdivision section.
5.10 Subdivision Standards
  • 5.10 Subdivision Standards
Complete replacement of section
6 Engineering Standards
  • 5.13 Roads and access
  • 5.14 Stormwater and soil management
  • 5.15 Connecting to water and sewer services
  • 5.16 Crown roads
Complete replacement of section
NA
  • 5.17 Waste Management
New section

 

The Stage 1 drafts are supported and exhibited with new detailed stormwater guidelines that are referenced in the drafts and will supplement the DCP.

Further information about the project can be found on the Comprehensive Development Control Plan (DCP) Review Project Page.

Have Your Say

Feedback to the Stage 1 drafts of the Comprehensive DCP Review are welcome during the exhibition period which runs from 6 August to 17 September 2025.

Feedback may be provided by:

  • By email: [email protected] with “Have Your Say - Stage 1 - Comprehensive Development Control Plan (DCP) Review”  in the subject line
  • By post: Chief Executive Officer, Bega Valley Shire Council, PO Box 492, Bega NSW 2550
  • Online: complete our online sumbission form at the bottom of this page

Submissions must include your full name and address, contact details, signature and political donations or gifts disclosure.

Under the Government Information (Public Access) Act 2009, details of your submission, including your name and address will be publicly available on request. You can request that your name and address not be disclosed by writing “objection in confidence” on your submission, however Council may still be obliged to release these details. Submissions that do not contain the author’s name and address may not be considered as Council will be unable to validate their authenticity.

If you have any questions please get in touch with us.

Frequently asked questions

[FAQ]

Documents on exhibition:

The Stage 1 drafts are provided as three files:

 

Related documents

The Stage 1 drafts reference Design Specifications and a draft Waste Management Plan template. These documents are not part of the exhibition package, however, links to them may be found on the Comprehensive Development Control Plan (DCP) Review Project Page. Feedback specific to these documents may be provided to the relevant Council staff for consideration but will not be incorporated with the submissions to the Stage 1 documents on exhibition, nor reported back to Council.

 

Who's listening

Anna Bowman
Town Planner
Bega Valley Shire Council
Phone: 0427 379 504
Email: [email protected]

 

Please submit your feedback by: Wednesday 17 September 2025

 

Online feedback form

 

 

Contact Us

  • 02 6499 2222
  • [email protected]
  • Zingel Place
    PO Box 492
    Bega NSW 2550

  • Monday to Friday 9.00AM to 4.30PM
    Administration building Zingel Place Bega
    Australia

  • ABN: 26 987 935 332