Council is undertaking a comprehensive review of the Bega Valley Development Control Plan 2013.
All development applications in Bega Valley Shire are required to consider Bega Valley Development Control Plan 2013 (DCP 2013) as a matter for consideration under Section 4.15(1)(a)(iii) of the Environmental Planning and Assessment Act 1979.
Council staff have commenced a thorough review of DCP 2013. The project, known as the Comprehensive Development Control Plan Review (the DCP Review) consists of four stages and will result in a whole new DCP with the name reflecting the year of completion.
Each stage will be presented to Council on completion of the drafts, seeking a resolution for public exhibition. Following public exhibition, any feedback and proposed amendments will be reported back to Council for adoption, with each stage coming into effect once adopted by Council. Once all stages of the review are completed, the DCP will be renamed to reflect the year of completion.
After each stage is adopted, it’s use will be monitored for any required amendments.
Stage 1 seeks to amend or replace the existing sections of the DCP listed in column 1 with the draft DCP listed in column 2:
Exising sections | New section/s or amending section/s | Extent of proposed changes |
---|---|---|
4.3 Setbacks |
|
Minor amendment to retain existing effect (removal of reference to Section 5.7) |
5.7 On-site Sewerage Management |
|
Complete replacement of section |
5.8.3 Contaminated land |
|
Complete replacement of section |
5.8.4 Bushfire prone land |
|
Amendments to existing section. New subdivision section. |
5.10 Subdivision Standards |
|
Complete replacement of section |
6 Engineering Standards |
|
Complete replacement of section |
NA |
|
New section |
The Stage 1 drafts are supported and exhibited with new detailed stormwater guidelines that are referenced in the drafts and will supplement the DCP.
Council’s Development Engineers have concurrently developed new draft Design Specifications, which are referenced in the drafts. The draft Design Specifications are also available for review throughout the exhibition period. (See Related Documents).
Stage 2 of the DCP Review will include review of the following sections:
Stage 3 of the DCP Review will include review of the following sections:
Stage 4 of the DCP Review will include review of the following:
The aims of the project are to:
The project is funded by Council’s General Fund and will be delivered by Council staff.
This project supports the implementation of Council’s adopted Delivery Plan 2025-2029 as identified through the following Focus Project:
This project aligns with Bega Valley Shire Council Community Strategic Plan through:
Stage 1 is currently on exhibition. To view the drafts and/or make a submission, go to Council’s Have Your Say page.
Anna Bowman
Town Planner
Bega Valley Shire Council
Phone: 0427 379 504
Email: [email protected]
Zingel Place
PO Box 492
Bega NSW 2550
Monday to Friday 9.00AM to 4.30PM
Administration building Zingel Place Bega
Australia
ABN: 26 987 935 332