Dune Enhancement Project

This project aims to stabilise and protect dune systems to reduce current risks to natural and built assets as well as increase resilience to future threats from climate change driven sea level rise.


Contact Us

  • 02 6499 2222
  • [email protected]
  • Zingel Place
    PO Box 492
    Bega NSW 2550

  • Monday to Friday 9.00AM to 4.30PM
    Administration building Zingel Place Bega
    Australia

  • ABN: 26 987 935 332